Transfer in Moravian Karst


Organized public transport system for visitors to the Punkevni Caves was introduced in 1993, and was one of the consequences of gradual closing down of the roads in Pusty and Suchy Zleb to traffic. Motorcars, smog, chaos, unauthorized parking, and noise - all disappeared from polluted and crowded roads. Road and the parking lot serving the Punkevni Caves, that used to be blocked with automobiles, now have the character of a pedestrian zone. 


 

Train

The means of public transport that convey the visitors to the Punkevni Caves from terminal parking lot Skalni Mlyn, consist of two road trains, and cable way connection that takes the visitors from the Punkevni Caves to observation bridges at Macocha Abyss.

Cableway

Cableway has been providing this service from 1995, and it is regarded as being one of the most environment-friendly transport means. What is more, it has been set into the landscape in the most sensitive and functional way and there can, therefore, be no doubt about its importance. Since its opening on May 6, 1995, the cable way has safely conveyed hundreds of thousands of visitors. It provides welcomed alternative to all those visitors to Moravian Karst who find walking difficult, and to those who simply do not feel like walking. Apart from everything else, the cableway has made elimination of all motor traffic from Suchy Zleb.

Price list  

Effective from 1.1.2017. Prices are in CZK.

Train two-way ticket ticket
Adults 90,- 80,-
Children, Students 60,- 50,-
Cable lift two-way ticket ticket
Adults 100,- 80,-
Children, Students 70,- 50,-
Combi two-way ticket ticket
Adults 160,- 120,-
Children, Students 100,- 80,-
Parking
Car 50,-
Moto 50,-
Bus 100,-
Baggage, bicycles, prams 10,-

Free of charge

  • Children younger than 3 years of age, excluding organized children group tours 

Discounts

  • Children in the age of 3 to15, organized group tours of children up to 3 years of age
  • Holders of ZTP and ZTPP Certificates
  • Students, upon presenting a valid proof of their studies.

Train and cableway timetable:

  • Train and cableway Timetable is harmonized with the Timetable of excursions to the Punkevni Caves.

Technical data

Road Trains
Opened on 22.5.1993
Route length approx. 2 km
Manufacturer Tschu-Tschu Bahnen, Germany
Engine type Nissan
Number of trains 2 (winter, summer)
Year of manufacture 1993
Speed to 25 km/h
Starting station Skalni mlyn
Terminus The Punkevni Caves
Duration of journey approx. 10 min.
Cableway
The foundation stone laid on 27.6.1994
Opened on 6.5.1995
Manufacturer Doppelmayr, Austria
Altitude at the Lower Station 361,83 m above sea
Altitude at the Upper Station 492,92 m above sea
Duration of journey 2,05 - 2,12 minutes
Super elevation 131,9 m
Number of load-bearing trestles 2
Slant length 249,31 m
Number of cabins 2
Carry capacity (persons/hr) 353
Cabin capacity 15 persons
Conveying speed 2,5 m/s
Average slope 63,41 %
Cable diameter 41,00 mm